When you drive along the Hume Highway between Sydney and Melbourne, or along the Federal Highway between Goulburn and Canberra, if you pay attention to the scenery, every few kilometres you might just notice a non-descript concrete structure sitting in a paddock just off the highway, looking like nothing quite so much as a misplaced bunker. They are easy to miss if you aren’t looking for them, but in fact they are one of the few remaining signs of a remarkable achievement in Australian telecommunications engineering – the Sydney-Melbourne Co-axial Cable.
When you drive along the Hume Highway between Sydney and Melbourne, or along the Federal Highway between Goulburn and Canberra, if you pay attention to the scenery, every few kilometres you might just notice a non-descript concrete structure sitting in a paddock just off the highway, looking like nothing quite so much as a misplaced bunker. They are easy to miss if you aren’t looking for them, but in fact they are one of the few remaining signs of a remarkable achievement in Australian telecommunications engineering – the Sydney-Melbourne Co-axial Cable.
The co-ax repeater hut at Wollogorang, south of Goulburn. |
In the words of the editorial in the February 1962 edition
of The Telecommunications Journal of Australia:
It is difficult to
convey the vastness of the project to those who were not associated directly
with the work. Telecommunications
engineering works are not spectacular in nature, and now that the
Sydney-Melbourne cable has been laid, there is little visible evidence that the
work was undertaken. Even at the height
of the cable construction, the effort extended over such a long length of the
route that its magnitude was not obvious.
Nevertheless it
involved the laying of 600 miles of cable across difficult terrain… Some one million tons of rock and soil were
excavated for the trench in which the cable was laid, and this represents a
major civil engineering effort equivalent to the excavation required in the
construction of a large dam…. It was, both in size and complexity, by far the
largest work of this nature ever undertaken in Australia. [TJA, February 1962, p166]
Co-ax repeater hut, just north of Goulburn. |
In the various commemorations at the time of the fiftieth anniversary of the completion of the cable, it was common to see it described
as the “NBN of its day”. The comparison
fails in a number of ways. In terms of
cost, the Sydney-Melbourne co-ax cable cost a mere £6.89m – equivalent to
approximately $175m in 2015 terms. The
project was completed and the first telephone circuits across the 1000kms of
cable were brought into service within 33 months of the signing of the
contracts for the work. But probably
what people are trying to say when they throw around comparisons to the NBN is
that it was a momentous milestone in the nation’s telecommunications evolution,
requiring vision, a certain degree of audacity, and large measures of plain
hard work and disciplined implementation.
Co-ax repeater hut, just south of Goulburn. |
In this blog I am going to try provide an overview of the
Sydney-Melbourne co-ax cable, the issues it was designed to address and the
project to build it, accompanied by historical images from its construction and
present-day photos of some of the remnants.
Why build a new Sydney-Melbourne cable?
At a superficial level, it may be self-evident that as
demand grows, telecommunications systems need to be upgraded and enlarged, but
it is worthwhile to dig a little further into the background to the
circumstances that led to the decision to build the Sydney-Melbourne Co-ax.
Detail from a map inside Wollogorang repeater station |
The first telephone circuit between Sydney and Melbourne had
been opened on 14 June 1907, running over an open-wire system (ie traditional
aerial wires strung from poles). With
developments in technology, this route had been upgraded with the addition of ten
12-channel systems – apparently offering the ability to run upto 120
simultaneous calls. After the end of
the Second World War, a large volume of suppressed commercial demand was
released, which was in turn reflected in greater demand for telephony. Accordingly, a further open-wire route was
commissioned, adding a further set of ten 12-channel systems. By 1947, the route was carrying 48
Sydney-Melbourne circuits, 12 Sydney-Canberra circuits and 22
Melbourne-Canberra circuits, in addition to other trunk circuits to other state
capitals.
Detail from a map inside Wollogorang repeater station |
Despite this investment and construction, demand for
telephony continued to outstrip capacity, and each channel was so valuable that
it had to be operated to secure absolute maximum usage. At least three operators were involved in the
handling of each call. In the first
place, there would be a “booking telephonist” who recorded the request for the
call, in what was called a “reverted” call system, meaning that you placed your
request for a line and the operators would “revert” to you when there was
capacity for the call to be made. When
the time came for the call, an operator at each end would contact the parties
and bring them to the telephone to wait several minutes for the next available
circuit. At times, it was not uncommon
to have to wait 2 to 3 hours between requesting a call and being able to
actually make it. In that environment,
things like the transmission of television broadcasts were out of the
question. Significantly more capacity
was required.
Detail from a map inside Wollogorang repeater station |
So why co-axial?
Which begs the question for most people – what is co-axial
cable? A single co-axial cable has an
inner conductor or wire, surrounded by an insulator, which in turn is
surrounded by a further tubular conductor that shields the cable. When a signal is carried on the main inner
conductor, the shielding prevents leakage of the signal to neighbouring objects
(such as other nearby cables), but also protects the signal from external
interference, allowing more faithful transmission of high-frequency signals
over a distance. The “co-axial” refers
to the fact that the inner wire and the outer circular shield have the same
central axis.
The range of options available to the Post Office when
choosing the technology for the new trunk links between Sydney and Melbourne
included radio, co-axial cable, “quad carrier” cable, open-wire systems, or a
hybrid combination of these.
Of these options, co-axial cable and microwave systems
offered the ability to relay television programmes. Open wire systems, basically continuing to
add to the existing technology, had limited capacity and high maintenance
costs, being exposed to the elements.
Diagram showing the structure of the co-ax cable. From J.F.Sinatt, "Design of the Cable Plant" Telecommunications Journal of Australia Volume 13, No. 3 February 1962 |
Ultimately, a co-axial cable system offered the right
combination of functionality, scope for further development, capital cost and
ongoing maintenance costs.
The cable that was laid actually comprised six separate
co-axial tubes, with each inner conductor having a diameter of 2.6mm, and an
inner diameter for the outer conductor of 9.5mm (the metric measurements in
Imperial-system Australia attributable to the German manufacture of the cable –
more on that below). In addition to the
six co-axial tubes, inside the cable were an additional sixteen “quad carrier”
wires, providing 32 wire-pairs for control and supervising circuits,
gas-pressure alarms and short-haul carrier systems. The granite memorial plaques that were laid at Casula and Melbourne to commemorate the completion of the cable record the total diameter of the sheath as "2 inches", but that seems likely to be just a rough approximation.
Repeater stations
There were a total of 118 stations housing transmission
equipment along the route from Sydney to Melbourne. Of these 103 are unattended minor stations
(the “misplaced bunkers” mentioned in the introduction), there was a
terminal station at each of Sydney South Exchange and Melbourne West Exchange,
and then thirteen manned main-repeater stations located at Campbelltown,
Bowral, Goulburn, Canberra, Yass, Gundagai, Wagga, Culcairn, Albury,
Wangaratta, Benalla, Euroa and Seymour.
Plan of an unattended repeater station. From J.V Dunn and M. Fizelle "Buildings" Telecommunications Journal of Australia Volume 13, No. 3 February 1962 |
It appears that a known pilot frequency of 4,092kHz was
transmitted on one channel of the cable, and then equipment at each repeater
station compared the pilot signal to the known frequency, and any corrections
and amplifications were applied to the signals before they were re-transmitted
to the next station.
Detail from the amplification equipment Wollogorang repeater station. |
Instruction chart. Wollogorang repeater station. |
Instruction chart, Wollogorang repeater station. |
Manufacturer's logo on repeater equipment Wollogorang repeater station. "FGF"stands for Felten and Guilleaume Fenmeldeanlagen, the West German manufacturer. |
Repeater equipment, Wollogorang repeater station. |
Detail from the repeater equipment Wollogorang repeater station. |
Detail from the repeater equipment Wollogorang repeater station |
Detail from the repeater equipment, showing the logo of the manufacturer, Felten and Guilleaume. The logo is an "FG"superimposed over the top of a trident. The word at the bottom is "Neptun". |
Temperature affected the signal propagation and the performance of the repeater equipment, so the repeater stations were designed to minimise temperature fluctuations. Walls and the roof of the repeater huts were double-layered, with an air-gap between the layers for insulation, and entry was through a short lobby with two heavy steel-clad doors, one at
either end, to minimise air-flow during staff entry. With external heat the main concern, the two doors were specifically designed with a ventilator grille at the top of the outside door, but at the bottom of the inside door. The huts are all oriented to face south or south of east, to minimise sunlight entering through the open doors.
The repeater huts were all pre-fabricated from concrete,
with outside dimensions of 14 feet by 12 feet (approximately 4.3m by 3.7m), and
an internal ceiling height of 8 foot (about 2.4m). In areas subject to flooding, the huts were
constructed with raised floors and external stairs.
Today, the remaining repeater stations are in a range of different conditions. In more built-up areas, some of the sites have been sold-off and the repeater huts demolished. Some huts have been stripped and reused to house equipment for subsequent fibre-optic cables that serve the same Sydney-Melbourne route. In rural areas, some of the huts have been left unsecured and have been used by humans to camp in, livestock to shelter in, or sometimes just ransacked. Even where huts have been left secured, as with any unattended shelter in rural areas, they can be colonised by rats who nest in amongst the equipment and scatter droppings and nesting material.
Today, the remaining repeater stations are in a range of different conditions. In more built-up areas, some of the sites have been sold-off and the repeater huts demolished. Some huts have been stripped and reused to house equipment for subsequent fibre-optic cables that serve the same Sydney-Melbourne route. In rural areas, some of the huts have been left unsecured and have been used by humans to camp in, livestock to shelter in, or sometimes just ransacked. Even where huts have been left secured, as with any unattended shelter in rural areas, they can be colonised by rats who nest in amongst the equipment and scatter droppings and nesting material.
Route
A preliminary route for the cable had been determined in
1950, and this preliminary route had been used for issuing the request for
tenders to potential suppliers. Along
this preliminary route, sites for the 13 main repeater stations were selected
and locked-in, largely based on issues such as the location of appropriate
service centres, and population centres that were intended to be served by the
cable.
Map showing the route of the Sydney-Melbourne Co-ax From A.H. Kaye, "Main Features of the Project" Telecommunications Journal of Australia Volume 13, No.3 February 1962 |
That still left a requirement to determine the route between
these main repeaters. This was done by
progressively working down from a number of options chosen from detailed maps
and aerial photos, and then ultimately walking the routes using compass
bearings, to select the most suitable route.
Generally speaking, the factors influencing route section were a
preference for the shortest route, combined with considerations of access, practicability,
and security from hazards such as floods, landslips and erosion.
From there, an engineer made the detailed route selection
for a preliminary pegging party which placed pegs at thousand-foot intervals
and at angles in the route. This enabled
the preparation of basic survey plans, allowing repeater sites to be selected
so that the process could be started to acquire the sites. Once the sites had been selected, a detailed
final survey could be conducted, with pegging at 100-yard intervals. The cable was laid from the Sydney end, and
weather issues on the New South Wales section gave rise to a need for
non-sequential laying – skipping sections that were water-logged or even
flooded, and then returning to the difficult sections later when they had
dried-out. This meant that when it came
time for detailed surveying and pegging of the Victorian sections, this was
done in much greater detail, to allow identification of joints so that
cable-lengths could be accurately specified for sections that were being laid
out-of-sequence.
A concrete marker post above the route of the Sydney-Melbourne Co-ax, in a paddock just south of Goulburn. |
Once the cable was laid, the route was marked with
seven-foot concrete posts. Each one has
a metal plate on the top indicating the identity of the cable, the depth and
the direction of the cable-run on either side of the post. From each marker-post it should be possible
to see the next post or the repeater station.
Plate on a concrete marker post above the route of the Sydney-Melbourne Co-ax. It seems unlikely that the "Nearest Postmaster" would be able or interested to provide too much "further information". |
Cable laying
Once the detailed cable route had been determined, the cable laying process involved clearing any trees for a distance on either side of the route, ripping a trench along the line of the cable, drilling and blasting any rock material that couldn't be ripped, removing the ripped or blasted rock from the trench, laying the cable on top of an underbedding layer, covering the cable with an overbedding layer, timbering the overbedding, and then completing the backfilling. In areas where erosion was a concern, earth banks were used to direct run-off away from the cable route.
Some 17 rivers and about 120 creeks and gullies were crossed, with the cable being laid under the bed in most cases. On three major river crossings, such as the Goulburn River at Seymour, the cable was installed in conduit on road or railway bridges, but generally above-ground installation was avoided.
The initial plan for laying the cable was that ripping would proceed significantly in advance of the cable route, ripping the cable trench to the required depth of 4 feet. It was intended that this would enable early identification of any significant rocks in the cable path that might require power-tools or explosives to clear. This approach was taken for the first section from Sydney to Goulburn, until it was discovered that with either rain or soft soil, this sort of pre-ripping led to collapse of the soil for a significant distance on either side of the trench, with the result that the cable-laying or trenching machinery would become bogged, and occasionally the cable route had to be moved to one side to find more stable soil. South of Goulburn a different approach was taken, with pre-ripping only being done where it was known that it would provide assistance, and then only immediately in advance of the trenching.
A box of spare fuses from inside Wollogorang repeater station. |
A marker-post and pit in a paddock north of Goulburn. |
Old PMG-branded Eveready batteries, for powering the handset on the magneto phone to allow staff visiting the repeater hut to communicate with a main repeater station. |
A "Commonwealth of Australia" branded dustpan and broom, inside the lobby of an unmanned repeater station. |
Suppliers
For the Sydney to Canberra portion of the project, the cable itself was manufactured by Felten and Guilleaume Carlswerk A.G of West Germany. For the portion of the project south of Canberra, the cable was manufactured in Melbourne by Olympic Cables Pty Ltd as sub-contractor to Felten and Guileaume. Presumably this arrangement allowed the project to commence without delay, while Olympic Cables equipped their facilities in Melbourne for production.
The transmission equipment was manufactured primarily by Felten and Guilleaume Fernmeldeanlagen G.m.b.H. in West Germany.
Cable Pressurisation
Originally, the cable was designed to have mercury U-tube manometers installed at 1000-yard intervals, and connected to electrical contacts that would register the air-pressure falling below a pre-determined level. These mercury manometers were installed for roughly the first 350 miles of the cable from Sydney before testing was able to be undertaken on the first section. This testing revealed that six out of the ten tested manometers failed. Investigations revealed that the failures were due, at least in part, to impurities in the mercury being used, resulting in significant innaccuracy in operation.
The mercury manometers were subsequently replaced with mechanical bellows contactors, which made a connection between two wires within the co-ax sheath when the air pressure dropped below the pre-determined level. The bellows contactors were connected with different resistors to assist in identification of which contactor had been triggered, to assist in locating the approximate location of cable-breaks. At the repeater stations the air-pressurisation equipment gave the ability to inject tracer gas into the cable to assist in identifying the precise location of the breakage. It appears that the tracer gas would be either radon or freon. Apparently the freon would be coloured with a dye for visual identification of the cable-break. Presumably radon was used in association with a geiger counter.
Air pressurisation equipment inside Wollogorang repeater station. A pair of compressed-air cannisters would have been strapped to the wall using the leather straps at the bottom. |
The air-pressurisation cabinet with the door closed. Wollogorang repeater station. |
Labelling on the air-pressurisation equipment, Wollogorang repeater station. |
Customer impact
Once the cable was in full operation, it was possible for the first time to transmit a live television broadcast between Sydney and Melbourne. The additional voice capacity delivered not only better quality voice calls, but ultimately the ability to implement subscriber trunk dialling (STD) between the two state capitals, as there was now enough capacity available to meet demand on-demand, rather than requiring customers to book in advance. Finally, many population centres along the cable route were now able to receive significantly increased capacity and automation of their previously-manual exchanges.
References
- AH Kaye, "Main Features of the Project", The Telecommunications Journal of Australia, Vol 13 No 3, February 1962.
- IS McDuffie, "The Telecommunications Aspects", The Telecommunications Journal of Australia, Vol 13 No 3, February 1962.
- JF Sinnatt, "Design of the Cable Plant", The Telecommunications Journal of Australia, Vol 13 No 3, February 1962.
- DF Barrie and CH Hosking, "Installation of the Cable", The Telecommunications Journal of Australia, Vol 13 No 3, February 1962.
- FJ Harding, "The Gas Pressure Alarm System", The Telecommunications Journal of Australia, Vol 13 No 3, February 1962.
- AL Fisher, RJ Clark, RA Colins, "Transport of Cable and Other Materials", The Telecommunications Journal of Australia, Vol 13 No 3, February 1962.
- JV Dunn and M Fizelle, "Buildings", The Telecommunications Journal of Australia, Vol 13 No 3, February 1962.
- JR Walklate, "Design of Transmission Equipment", The Telecommunications Journal of Australia, Vol 13 No 3, February 1962.
- JW Pollard, "The Application of Gas Pressure Alarm Systems to Coaxial Cables", The Telecommunications Journal of Australia, Vol 13 No 1, June 1961.
Acknowledgments
Many thanks to the following people for generously giving their time, knowledge, resources and wisdom:
- Janko Radocaj
- Stef Nowak
- David Piltz
- Phill Sporton
And thanks and acknowledgment as always to Brian Mullins and the team of dedicated volunteers at the Telstra Museum Bankstown.
A similar photo-blog on the old Port Kembla Exchange can be found here: http://portkemblaexchange.blogspot.com/
- Janko Radocaj
- Stef Nowak
- David Piltz
- Phill Sporton
And thanks and acknowledgment as always to Brian Mullins and the team of dedicated volunteers at the Telstra Museum Bankstown.
A similar photo-blog on the old Port Kembla Exchange can be found here: http://portkemblaexchange.blogspot.com/
I'm making some No.6 battery replica labels. Ha s anyone got photos of "half way around" the No.6 Commonwealth P.M.G. battery ? I have frontals.